this post was submitted on 10 May 2025
748 points (99.6% liked)

pics

19745 readers
1138 users here now

Rules:

1.. Please mark original photos with [OC] in the title if you're the photographer

2..Pictures containing a politician from any country or planet are prohibited, this is a community voted on rule.

3.. Image must be a photograph, no AI or digital art.

4.. No NSFW/Cosplay/Spam/Trolling images.

5.. Be civil. No racism or bigotry.

Photo of the Week Rule(s):

1.. On Fridays, the most upvoted original, marked [OC], photo posted between Friday and Thursday will be the next week's banner and featured photo.

2.. The weekly photos will be saved for an end of the year run off.

Weeks 2023

Instance-wide rules always apply. https://mastodon.world/about

founded 2 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] TWeaK@lemm.ee 53 points 1 day ago (2 children)

Fun fact: You can estimate the voltage by the length of the insulators. My guess is this is around 100kV (2x 3 phase circuits), around the border of transmission and distribution voltages.

You can also estimate the capacity by the number of conductors per phase. This has a pair of lines for each phase, so a fair chunk, but not the 3 or 4 conductors you sometimes see (although maybe you mainly see that on higher transmission voltages.

[–] Jhestyr@lemmy.world 31 points 1 day ago (1 children)
[–] InverseParallax@lemmy.world 17 points 1 day ago

There are some who call him: Tim?

[–] sartalon@lemmy.world 2 points 1 day ago* (last edited 1 day ago) (2 children)
[–] TWeaK@lemm.ee 4 points 1 day ago

The more I look at it I think it might be a 132kV line on a 400kV tower, with the intention to upgrade it some time in the future. I say this because the insulators aren't actually the full length of the spacing from the tower, there's a separator between the tower and the start of the insulator fins. This makes me think they've left room for longer 400kV insulators to be installed.

Saying that though I have no idea, there could have been all sorts of other considerations that led to a configuration like that.

[–] qupada@fedia.io 14 points 1 day ago (2 children)

OP appears to be in the UK, so potentially (no pun intended) one of 400kV, 275kV, or 132kV.

[–] TWeaK@lemm.ee 5 points 1 day ago* (last edited 1 day ago) (1 children)

That pun was totally intended, and I cannot fault you for it.

I was thinking 132kV, but wasn't sure if this is Europe where you might find 100kV (although again it varies by country). In the UK, 132kV is the boundary between distribution and transmission. DNO's (Distribution Network Operators) generally use 11kV, 33kV, 66kV (generally rare but used in some areas eg in North West England) and 132kV, TNO's (Transmission) use 132kV, 275kV and 400kV. Although, a lot of 275kV substations are built to 400kV spec (eg in Scotland), so that they can upgrade in the future.

You sometimes get this with power lines, they might install higher voltage insulators then run it at a lower voltage until some time later when the network is upgraded. This spoils the game of guess the voltage/makes it more challenging, and you end up with really weird looking connections between large pylons and small poles.

[–] CelloMike@lemmy.world 6 points 1 day ago

According to the national grid map this is a 275kv line so there you go :)

no pun intended

None taken.